by Hutchison Flooring | Nov 24, 2023
Case Study 3 St Pauls Catholic College CASE STUDY St Pauls Catholic School PROPERTYSt Pauls Catholic School DETAILS Replacement of existing floor to a new Junckers Sprung floor using a New Era Sports Cradle and batten system Take a closer look Contact...
by Hutchison Flooring | Apr 5, 2023
Case Study 3 Dinesen Project CASE STUDY Dinesen Residential Project PROPERTYProperty in Hampshire DETAILSAs an approved Dinesen installer, we were commissioned to install over 300m2 of Dinesen Layers & solid oak plank throughout this property, sanded and finished...
by Hutchison Flooring | Mar 24, 2023
Case Study 3 Office Reception London CASE STUDY Office Reception London PROPERTYOffice Reception DETAILSEngineered Ash installed in a ladder pattern to create a nice feature design for this office Reception area. Once laid we finished with Hardwax oil for the perfect...
by Hutchison Flooring | Mar 24, 2023
Case Study 3 Shaftsbury Avenue Office CASE STUDY Office Shaftsbury Avenue PROPERTYShaftsbury Avenue Office Project – London DETAILS250m2 of engineered herringbone with a natural raw oiled finish, stuck down directly to metal pan raised access flooring. Thickness...
by Hutchison Flooring | Mar 22, 2023
Case Study 3 Stair Project North London CASE STUDY Stair Project North London PROPERTYResidential House DETAILSFully wrapped open steel staircase using 20mm engineered flooring with bespoke CNC mitred and jointed cuts to create a contemporary finish. All bonded using...